Set up procedures:
Remove the machine from the crate and move
to the location where it is to be used. Check
to ensure the machine is sitting solid and
level on the floor. If the machine rocks place
shims under the machine feet until the machine
is solid and level. Install anchors to the
floor to keep the machine from "walking" during
use. If the E+(electric) machine has been purchased
plug the power cord into the wall receptacle
ensuring the receptacle is grounded and any
extension cord is 12AWG or larger with a max
of 25FT in length. Fill the oiler with pneumatic
tool oil, turn on the air supply and using
the pressure regulator set the air pressure
to 90PSI.

|